Morning walk report on sidewalk progress. BOTH streets are in a state of flux. First one is now done with sidewalks and starts on the actual asphalt street on Monday. Today they delivered two HUGE vehicles, a 'steam roller' and a monster asphalt chopper grinder thingy that will 'eat' up the entire street and put it in dump trucks. Then they will dig out, level, grade the dirt, tamp it down, pour in sand, then gravel, the new asphalt. Gonna be fun to watch. Somehow, the normal 'parkers' have managed to almost clear the street which will be totally off limits to traffic for several days. Wow. Looks like maybe they might do it like ours was, one lane open, one direction and do half the street at a time. Will have to see.
Other street, just starting, I was amazed to see that out of 27 vehicles which were all over the left side (now marked no parking) only EIGHT remained! I have no idea why they couldn't do that all the time instead of every junk vehicle parked all over the road. Geeeeeez! Everyone has long driveways, plenty of room for all the vehicles it seems now that they heeded the signs. Gonna start installing new phone poles and removing old ones on Monday too. Lots to watch.
Cortisone shot in back from I think June, is wearing off. Starting to get cramping and scarier yet, I was lying on the couch, got up to get something to munch on and my right leg (the affected side) refused to move. Uhhuh. Scary. I finally figured out it was from a spasm on the inner side. No power to that leg. I'm going to have to check with doc on that NEW development. Never had anything like that happen.
